|
Determining the Reference Sample Size Needed to Control the Accuracy of the Conditional in‐control ARL of a Normal‐theory CUSUM
|
|
Daniel R. Jeske
|
32 |
7 |
2499–2504 |
2016 |
5.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Estimation of Complicated Profiles in Phase I, Clustering and S‐estimation Approaches
|
|
Hamid Shahriari, Orod Ahmadi, Yaser Samimi
|
32 |
7 |
2455–2469 |
2016 |
4.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Multivariate Process Capability Index Based on Data Depth Concept
|
|
Krzysztof Ciupke
|
32 |
7 |
2443–2453 |
2016 |
5.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
TRIZ: Engineering Methodologies to Improve the Process Reliability
|
|
G. Arcidiacono, L. Bucciarelli
|
32 |
7 |
2537–2547 |
2016 |
4.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A Bayesian‐based Reliability Estimation Approach for Corrosion Fatigue Crack Growth Utilizing the Random Walk
|
|
Lechang Yang, Jianguo Zhang, Yanling Guo, Pidong Wang
|
32 |
7 |
2519–2535 |
2016 |
4.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A New Nonparametric Control Chart for Monitoring Variability
|
|
Maoyuan Zhou, Qin Zhou, Wei Geng
|
32 |
7 |
2471–2479 |
2016 |
3.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Acceleration Factor Constant Principle and the Application under ADT
|
|
Hao‐Wei Wang, Wen‐Jun Xi
|
32 |
7 |
2591–2600 |
2016 |
3.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
An Overview of Control Charts for High‐quality Processes
|
|
Sajid Ali, Antonio Pievatolo, Rainer Göb
|
32 |
7 |
2171–2189 |
2016 |
3.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Change‐point Detection in Phase I for Profiles with Binary Data and Random Predictors
|
|
Yanfen Shang, Jianing Man, Zhen He, Haojie Ren
|
32 |
7 |
2549–2558 |
2016 |
5.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A New Control Scheme for Phase‐II Monitoring of Simple Linear Profiles in Multistage Processes
|
|
Majid Khedmati, Seyed Taghi Akhavan Niaki
|
32 |
7 |
2559–2571 |
2016 |
8.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|