|
A semiparametric profile monitoring via residuals
|
|
Zainab Siddiqui, Abdel‐Salam G. Abdel‐Salam
|
35 |
4 |
959–977 |
2018 |
11.96 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Reliability evaluation and opportunistic maintenance policy based on a novel delay time model
|
|
Jianjie Zhang
|
35 |
4 |
978–994 |
2018 |
10.94 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Parameter estimation for load‐sharing system subject to Wiener degradation process using the expectation‐maximization algorithm
|
|
Jianyu Xu, Bin Liu, Xiujie Zhao
|
35 |
4 |
1010–1024 |
2018 |
10.9 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Revisiting reweighted robust standard deviation estimators for univariate Shewhart S‐charts
|
|
Ece Çiğdem Mutlu, Burak Alakent
|
35 |
4 |
995–1009 |
2018 |
9.92 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Multivariate process incapability vector
|
|
Zainab Abbasi Ganji
|
35 |
4 |
902–919 |
2018 |
8.92 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
CCC‐r charts' performance with estimated parameter for high‐quality process
|
|
Min Zhang, Xuejun Hou, Hui Chen, Shuguang He
|
35 |
4 |
946–958 |
2018 |
8.92 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Enhancing the performance of the EWMA control chart for monitoring the process mean using auxiliary information
|
|
Nurudeen A. Adegoke, Saddam Akber Abbasi, Abdaljbbar B.A. Dawod, Matthew D.M. Pawley
|
35 |
4 |
920–933 |
2018 |
8.92 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Design and comparison of some Shewhart‐type schemes for simultaneous monitoring of Weibull parameters
|
|
Min Gong, Amitava Mukherjee
|
35 |
4 |
889–901 |
2018 |
7.98 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Monitoring Bernoulli processes considering measurement errors and learning effect
|
|
S. Abedin Daryabari, Behnam Malmir, Amirhossein Amiri
|
35 |
4 |
1129–1143 |
2019 |
6.98 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Consequences of using estimated response values from negligible interactions in factorial designs
|
|
Rafel Xampeny, Pere Grima, Xavier Tort‐Martorell
|
35 |
4 |
934–945 |
2018 |
6.96 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|