|
Monitoring bivariate and trivariate mean vectors with a Shewhart chart
|
|
Roberto Campos Leoni, Antonio Fernando Branco Costa
|
33 |
8 |
2035–2042 |
2017 |
3.92 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Optimization design of the CUSUM and EWMA charts for autocorrelated processes
|
|
Richard Osei‐Aning, Saddam Akber Abbasi, Muhammad Riaz
|
33 |
8 |
1827–1841 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
A GLR control chart for monitoring a multinomial process
|
|
Jaeheon Lee, Yiming Peng, Ning Wang, Marion R. Reynolds
|
33 |
8 |
1773–1782 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Examining robustness of model selection with half‐normal and LASSO plots for unreplicated factorial designs
|
|
Dae‐Heung Jang, Christine M. Anderson‐Cook
|
33 |
8 |
1921–1928 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Control charts for paired differences: and Sd charts
|
|
L.P. Nadeeka D. Premarathna, A. Jonathan R. Godfrey, Kondaswamy Govindaraju
|
33 |
8 |
1843–1854 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Unbiased Weibull capabilities indices using multiple linear regression
|
|
Manuel R. Piña‐Monarrez, Manuel Baro‐Tijerina, Jesús F. Ortiz‐Yañez
|
33 |
8 |
1915–1920 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Bayesian monitoring of linear profile monitoring using DEWMA charts
|
|
Tahir Abbas, Zhengming Qian, Shabbir Ahmad, Muhammad Riaz
|
33 |
8 |
1783–1812 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Run sum X¯ control chart with estimated process parameters
|
|
Sajal Saha, Michael B. C. Khoo, W. L. Teoh, Ming Ha Lee
|
33 |
8 |
1885–1899 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Exponentially weighted moving average control charts based on the moving average statistic and lnS2 for monitoring a Weibull process with subgroups
|
|
Fu‐Kwun Wang, Xiao‐Bin Cheng
|
33 |
8 |
1901–1913 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|
|
Blocking versus robustness in industrial contexts
|
|
Pere Grima, Lluís Marco‐Almagro, Xavier Tort‐Martorell
|
33 |
8 |
2121–2130 |
2017 |
0.0 |
|
平均評価: 0.0 / 5
(0 件のレビュー)
|