|
Nuclear Power Plant Instrumentation and Control Cable Prognostics Using Indenter Modulus Measurements
|
|
Dan McCarter, Brent Shumaker, Bryan McConkey, Hash Hashemian
|
6 |
3 |
2261–None |
2015 |
13.39 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A Novel Ensemble Clustering for Operational Transients Classification with Application to a Nuclear Power Plant Turbine
|
|
Sameer Al-Dahidi, Francesco Di Maio, Piero Baraldi, Enrico Zio, Redouane Seraoui
|
6 |
3 |
2267–None |
2015 |
13.14 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A Dynamic Weighted RBF-Based Ensemble for Prediction of Time Series Data from Nuclear Components
|
|
Jie Liu, Valeria Vitelli, Enrico Zio, Redouane Seraoui
|
6 |
3 |
2268–None |
2015 |
14.1 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Improved Visual Inspection of Advanced Gas-Cooled Reactor Fuel Channels
|
|
Graeme West, Paul Murray, Stephen Marshall, Stephen McArthur
|
6 |
3 |
2269–None |
2015 |
14.2 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Prognostic and Health Management of Active Assets in Nuclear Power Plants
|
|
Vivek Agarwal, Nancy Lybeck, Binh T. Pham, Richard Rusaw, Randall Bickford
|
6 |
3 |
2270–None |
2015 |
16.22 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A Review of Prognostics and Health Management Applications in Nuclear Power Plants
|
|
Jamie Coble, Pradeep Ramuhalli, Leonard Bond, J. Wesley Hines, Belle Upadhyaya
|
6 |
3 |
2271–None |
2015 |
11.37 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Micro Displacement and Strain Detection for Crack Prediction on Concrete Surface Using Optical Nondestructive Evaluation Methods
|
|
Longxi Luo, Maria Feng, Yoshio Fukuda, Chao Zhang
|
6 |
3 |
2272–None |
2015 |
18.06 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Improved Heat Exchanger Lifecycle Prognostic Methods for Enhanced Light Water Reactor Sustainability
|
|
Zachary Welz, Alan Nam, Michael Sharp, J. Wesley Hines, Belle R. Upadhyaya
|
6 |
3 |
2283–None |
2015 |
16.91 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Sensor-Based Degradation Prediction and Prognostics for Remaining Useful Life Estimation: Validation on Experimental Data of Electric Motors
|
|
Federico Barbieri, J. Wesley Hines, Michael Sharp, Mauro Venturini
|
6 |
3 |
2285–None |
2015 |
17.12 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Probabilistic Life Models for Steel Structures Subject to Creep- Fatigue Damage
|
|
Fatmagul Ibisoglu, Mohammad Modarres
|
6 |
3 |
2286–None |
2015 |
15.99 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|