アクセスランキング(PKV)
Currently viewing Reliability and Quality Engineering Field Ranking
Featured Field Today
Reliability and Quality Engineering
Discover highly accessed papers in this field.
Top Paper
Phased UAV Swarm Mission Reliability Assessment Considering Cascading Failures
| 順位 | タイトル | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| 著者 | 雑誌 | 巻 | 号 | ページ | 年 | PKVアクセス数 | |||
| 2691 | Robust optimization: A kriging-based multi-objective optimization approach | ||||||||
| Mélina Ribaud, Christophette Blanchet-Scalliet, Céline Helbert, Frédéric Gillot | Reliability Engineering & System Safety | 200 | None | 106913–None | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2692 | A distribution-free joint monitoring scheme for location and scale using individual observations | ||||||||
| Marcus B. Perry, Zhi Wang | Journal of Quality Technology | 54 | 2 | 144–161 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2693 | Simple and useful statistical control charts for monitoring count data | ||||||||
| Marcelo Bourguignon, Rodrigo M.R. Medeiros, Fidel Henrique Fernandes, Linda Lee Ho | Quality and Reliability Engineering International | 37 | 2 | 541–566 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2694 | Planning constant‐stress accelerated life tests with multiple stresses based on D‐optimal design | ||||||||
| Xiangxiang Zhang, Jun Yang, Xuefeng Kong | Quality and Reliability Engineering International | 37 | 1 | 60–77 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2695 | A triple exponentially weighted moving average control chart for monitoring time between events | ||||||||
| Vasileios Alevizakos, Kashinath Chatterjee, Christos Koukouvinos | Quality and Reliability Engineering International | 37 | 3 | 1059–1079 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2696 | On the design of nonparametric runs‐rules schemes using the Markov chain approach | ||||||||
| Sandile C. Shongwe | Quality and Reliability Engineering International | 36 | 5 | 1604–1621 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2697 | A stochastic simulation-optimization model for base-warranty and extended-warranty decision-making of under- and out-of-warranty products | ||||||||
| Mohsen Afsahi, Mahmood Shafiee | Reliability Engineering & System Safety | 197 | None | 106772–None | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2698 | Two successive occasions resubmitted sampling scheme‐based control chart | ||||||||
| Asma Arshad, Muhammad Azam, Muhammad Aslam | Quality and Reliability Engineering International | 37 | 3 | 950–965 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2699 | A hidden Markov model to detect regime changes in cryptoasset markets | ||||||||
| Paolo Giudici, Iman Abu Hashish | Quality and Reliability Engineering International | 36 | 6 | 2057–2065 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||
| 2700 | A Kullback‐Leibler information control chart for linear profiles monitoring | ||||||||
| Yu‐Ching Chang, Chang‐Ming Chen | Quality and Reliability Engineering International | 36 | 7 | 2225–2248 | 2020 | 5.0 | |||
| 平均評価: / 5 ( 件のレビュー) | |||||||||