Powered by Engineering Brain, Japan | What is PKV? | PKV Methodology | KnowledgeRank v6.0.0: Earn Points for Reviews and Feature Your Paper in the Rankings

A multi-stage stochastic programming for joint condition-based replacement and spare parts ordering towards complex manufacturing system with uncertain lead times

['Yutong Ding', 'Tangbin Xia', 'Yu Wang', 'Kaigan Zhang', 'Yaping Li', 'Zhen Chen', 'Lifeng Xi']   /   Reliability Engineering & System Safety / Vol. 264
0.0 / 5
0 Reviews
You must log in to post, edit and delete a review.
Log in
Earn 50 points when your review is published. About KnowledgeRank Points
Review distribution
5
0%
4
0%
3
0%
2
0%
1
0%

No reviews have been posted yet. Be the first to write one!