Powered by Engineering Brain, Japan | What is PKV? | PKV Methodology | KnowledgeRank v6.0.0: Earn Points for Reviews and Feature Your Paper in the Rankings

A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning

['Hasan Hüseyin Turan', 'Mahir Atmis', 'Fuat Kosanoglu', 'Sondoss Elsawah', 'Michael J. Ryan']   /   Reliability Engineering & System Safety / Vol. 204
0.0 / 5
0 Reviews
You must log in to post, edit and delete a review.
Log in
Earn 50 points when your review is published. About KnowledgeRank Points
Review distribution
5
0%
4
0%
3
0%
2
0%
1
0%

No reviews have been posted yet. Be the first to write one!