Powered by Engineering Brain, Japan | What is PKV? | PKV Methodology | KnowledgeRank v6.0.0: Earn Points for Reviews and Feature Your Paper in the Rankings

Reliability Engineering & System Safety - Volume 220 / Issue None

Title
Authors Volume Issue Page Year PKV
Reliability analysis using adaptive Polynomial-Chaos Kriging and probability density evolution method
Tong Zhou, Yongbo Peng 220 None 108283–None 2022 11.86
Average Rating: 0.0 / 5 (0 Reviews)
Simulation optimization framework for dynamic probabilistic safety assessment
Jong Woo Park, Seung Jun Lee 220 None 108316–None 2022 11.82
Average Rating: 0.0 / 5 (0 Reviews)
A method for fault detection in multi-component systems based on sparse autoencoder-based deep neural networks
Zhe Yang, Piero Baraldi, Enrico Zio 220 None 108278–None 2022 10.88
Average Rating: 0.0 / 5 (0 Reviews)
Holistic risk assessment of container shipping service based on Bayesian Network Modelling
Yusheng Zhou, Xue Li, Kum Fai Yuen 220 None 108305–None 2022 10.84
Average Rating: 0.0 / 5 (0 Reviews)
Short-term maintenance planning of autonomous trucks for minimizing economic risk
Xin Tao, Jonas Mårtensson, Håkan Warnquist, Anna Pernestål 220 None 108251–None 2022 9.92
Average Rating: 0.0 / 5 (0 Reviews)
A predictive analytics method for maritime traffic flow complexity estimation in inland waterways
Mingyang Zhang, Di Zhang, Shanshan Fu, Pentti Kujala, Spyros Hirdaris 220 None 108317–None 2022 9.92
Average Rating: 0.0 / 5 (0 Reviews)
Know your safety indicator – A determination of merchant vessels Bow Crossing Range based on big data analytics
Mateusz Gil, Paweł Kozioł, Krzysztof Wróbel, Jakub Montewka 220 None 108311–None 2022 9.88
Average Rating: 0.0 / 5 (0 Reviews)
An extended HEART Dempster–Shafer evidence theory approach to assess human reliability for the gas freeing process on chemical tankers
Sukru Ilke Sezer, Emre Akyuz, Ozcan Arslan 220 None 108275–None 2022 8.92
Average Rating: 0.0 / 5 (0 Reviews)
Preventive maintenance for heterogeneous parallel systems with two failure modes
Rui Peng, Xiaofeng He, Chao Zhong, Gang Kou, Hui Xiao 220 None 108310–None 2022 8.9
Average Rating: 0.0 / 5 (0 Reviews)
Joint optimization of preventive maintenance and production rescheduling with new machine insertion and processing speed selection
Youjun An, Xiaohui Chen, Jiawen Hu, Lin Zhang, Yinghe Li, Junwei Jiang 220 None 108269–None 2022 8.88
Average Rating: 0.0 / 5 (0 Reviews)