Powered by Engineering Brain, Japan | What is PKV? | PKV Methodology | KnowledgeRank v6.0.0: Earn Points for Reviews and Feature Your Paper in the Rankings

Reliability Engineering & System Safety - Volume 218 / Issue None

Title
Authors Volume Issue Page Year PKV
Model correction and updating of a stochastic degradation model for failure prognostics of miter gates
Chen Jiang, Manuel A. Vega, Michael D. Todd, Zhen Hu 218 None 108203–None 2022 8.84
Average Rating: 0.0 / 5 (0 Reviews)
A new parallel adaptive structural reliability analysis method based on importance sampling and K-medoids clustering
Zequan Chen, Guofa Li, Jialong He, Zhaojun Yang, Jili Wang 218 None 108124–None 2022 7.92
Average Rating: 0.0 / 5 (0 Reviews)
Reliability evaluation of demand-based warm standby systems with capacity storage
Heping Jia, Rui Peng, Li Yang, Tianyi Wu, Dunnan Liu, Yanbin Li 218 None 108132–None 2022 7.92
Average Rating: 0.0 / 5 (0 Reviews)
Structural characteristics analysis and cascading failure impact analysis of urban rail transit network: From the perspective of multi-layer network
Dezhi Yin, Wencheng Huang, Bin Shuai, Hongyi Liu, Yue Zhang 218 None 108161–None 2022 7.9
Average Rating: 0.0 / 5 (0 Reviews)
A Bayesian condition-based maintenance and monitoring policy with variable sampling intervals
Dimitris Kampitsis, Sofia Panagiotidou 218 None 108159–None 2022 7.9
Average Rating: 0.0 / 5 (0 Reviews)
Asymmetric inter-intra domain alignments (AIIDA) method for intelligent fault diagnosis of rotating machinery
Jinwook Lee, Myungyon Kim, Jin Uk Ko, Joon Ha Jung, Kyung Ho Sun, Byeng D. Youn 218 None 108186–None 2022 7.88
Average Rating: 0.0 / 5 (0 Reviews)
A maintenance policy for a k-out-of-n system under enhancing the system’s operating time and safety constraints, and selling the second-hand components
Fatemeh Safaei, Jafar Ahmadi, Sharareh Taghipour 218 None 108103–None 2022 7.88
Average Rating: 0.0 / 5 (0 Reviews)
Optimal control to improve reliability of demand responsive transport priority at signalized intersections considering the stochastic process
Shidong Liang, Hu Zhang, Zhiming Fang, Shengxue He, Jing Zhao, Rongmeng Leng, Minghui Ma 218 None 108192–None 2022 7.84
Average Rating: 0.0 / 5 (0 Reviews)
Universal generating function -based narrow reliability bounds to evaluate reliability of project completion time
Mohsen Babaei, Amin Rashidi-baqhi 218 None 108121–None 2022 7.84
Average Rating: 0.0 / 5 (0 Reviews)
A Birnbaum importance-based two-stage approach for two-type component assignment problems
Siqi Qiu, Xinguo Ming, Mohamed Sallak, Jialiang Lu 218 None 108051–None 2022 6.9
Average Rating: 0.0 / 5 (0 Reviews)