|
An open modelling approach for availability and reliability of systems
|
|
Jussi-Pekka Penttinen, Arto Niemi, Johannes Gutleber, Kari T. Koskinen, Eric Coatanéa, Jouko Laitinen
|
183 |
None |
387–399 |
2019 |
2.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Predicting system failure rates of SRAM-based FPGA on-board processors in space radiation environments
|
|
Seunghwa Jung, Jihwan P. Choi
|
183 |
None |
374–386 |
2019 |
0.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A general failure-pursuing sampling framework for surrogate-based reliability analysis
|
|
Chen Jiang, Haobo Qiu, Zan Yang, Liming Chen, Liang Gao, Peigen Li
|
183 |
None |
47–59 |
2019 |
0.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A novel failure mode and effect analysis model for machine tool risk analysis
|
|
Huai-Wei Lo, James J.H. Liou, Chun-Nen Huang, Yen-Ching Chuang
|
183 |
None |
173–183 |
2019 |
1.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Status and future perspectives of reliability assessment for electric vehicles
|
|
Foad H. Gandoman, Abdollah Ahmadi, Peter Van den Bossche, Joeri Van Mierlo, Noshin Omar, Ali Esmaeel Nezhad, Hani Mavalizadeh, Clément Mayet
|
183 |
None |
1–16 |
2019 |
0.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Influence of failure propagation on mission abort policy in heterogeneous warm standby systems
|
|
Gregory Levitin, Liudong Xing, Liang Luo
|
183 |
None |
29–38 |
2019 |
1.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Submodularity issues in value-of-information-based sensor placement
|
|
C. Malings, M. Pozzi
|
183 |
None |
93–103 |
2019 |
0.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A repair and replacement policy for repairable systems based on probability and mean of profits
|
|
Fatemeh Safaei, Jafar Ahmadi, N. Balakrishnan
|
183 |
None |
143–152 |
2019 |
1.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
A tool for evaluating repairable systems based on Generalized Renewal Processes
|
|
Cícero Carlos Felix de Oliveira, Paulo Renato Alves Firmino, Cláudio Tadeu Cristino
|
183 |
None |
281–297 |
2019 |
0.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|
|
Optimization of high-level preventive maintenance scheduling for high-speed trains
|
|
Boliang Lin, Jianping Wu, Ruixi Lin, Jiaxi Wang, Hui Wang, Xuhui Zhang
|
183 |
None |
261–275 |
2019 |
1.0 |
|
Average Rating: 0.0 / 5
(0 Reviews)
|